All casing is entrusted to Ryo Construction Foundation! "All Casing Method"

There is little impact on the surrounding ground, and it is possible to excavate bedrock and boulders as well as cut reinforced concrete! We also have many application methods available.

The "All Casing Method" is a technique that involves excavating the interior while protecting the drilling hole with a casing tube. At Hishiken Kiso Co., Ltd., we offer various application methods, including not only obstacle removal but also low-noise and low-vibration excavation using hydraulic hammer grabs, and reinforcement of the ground at the tip using concrete rings. 【Advantages of the "All Casing Method"】 ■ Minimal impact on surrounding ground ■ Capable of excavating bedrock, boulders, cobblestones, and cutting reinforced concrete ■ Beneficial for environmental conservation measures, such as wastewater treatment and consideration for groundwater ■ Low moisture content in excavated soil, making residual soil disposal relatively easy ■ The side friction force is comparable to driven piles due to the absence of stabilizing fluids or mud water *For more details, please refer to the PDF materials or feel free to contact us.

  • TOP.png
  • s1.png
  • s2.png
  • s3.png
  • IPROS99319526122999904887.png
  • IPROS65357177214851006840.png
  • Ground foundation construction method
  • Civil Engineering Method
  • Foundation construction
  • Casing method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Full Circumference Rotational All-Casing Method "EXL Method"

Self-propelled full rotation all-casing drilling machine "Excel Method"

The self-propelled full rotation excavator "Excel Method" demonstrates the unique mobility of self-propelled machines. Additionally, compared to the currently mainstream stationary excavators, it has a casing rotation speed that is about 1.5 times faster and a casing lift stroke that is three times greater, allowing for faster excavation and the ability to easily cut through hard boulders and rocks. There is no need to lift the machine body, eliminating the requirement for large cranes.

  • Ground foundation construction method
  • Casing method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Yamamoto Basic Industrial Co., Ltd. Method Introduction: Low Headroom Slide Method

Work can be done from a height of 4.5 meters! Work efficiency has significantly improved.

The low-headroom all-casing (full rotation) sliding method has made it possible to work in low-headroom conditions of 4.5 meters, where heavy machinery could not previously enter, significantly improving work efficiency. It adopts a telescopic sliding arm that extends up to 9 meters, allowing work even in narrow sites, making it ideal for tasks inside buildings and under highway girders that were impossible with conventional methods. By employing the full rotation all-casing method, it allows for excellent excavation by pre-inserting the casing tube and rotating it. 【Features】 ○ Work possible from a headroom of 4.5 meters ○ Method enabling low-headroom work ○ Sliding type adapted to the site ○ Reliable all-casing method ○ Significantly improved work efficiency For more details, please contact us or download the catalog.

  • Foundation construction
  • Dam construction
  • Other civil engineering works
  • Casing method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Casing methodに関連する検索キーワード